Success criteria at Week 16

The core path (Week 16; Week 20 for a fresher) is done when all four checkpoints pass their Done-when rows and you have handed in the evidence:

  • Checkpoint 1: the baseline report and raw timestamp files.
  • Checkpoint 2: the overlay, the driver or service, and the 1,000-cycle log.
  • Checkpoint 3: the PRU step engine, raw captures and ADR-3.
  • Checkpoint 4: the image build, the power-cut and rollback logs, the 24-hour soak report, the threat model and the readout.
  • Self-scores of at least 2 on every dimension (fresher), 3 (senior), or the targets in "Who this is for".
  • Staff and Principal: Checkpoint W, with the signed ADR, before and after numbers, the independent scorer and the booked three-month recheck. Everyone else: optional.