Core path only. Optional work and the work version are extra. Staff and Principal readers replace Checkpoints 1 to 3 with Checkpoint 4 and the evidence of their level variant; a Principal's core path also needs Checkpoint W, because a lab hand-in alone is not promotion evidence.
Principal only: Checkpoint W passes with its approval proof, the before and after table and the dated 90-day recheck (the recheck result may arrive after the 16 weeks).
Checkpoint 1 passes with the provisioning script, the 20-trial kill table, the hardening score and the disk-full capture.
Checkpoint 2 passes with the prediction-against-observation table, the leak kill, the throttling evidence and the USE table.
Checkpoint 3 passes with the firewall ruleset, three network-fault diagnoses and the blocked-call log.
Checkpoint 4 passes with write-ups for your faults (four for a fresher, six for Senior and above), the runbook, the restore log and the rollback log.
The repository README opens with the scenario and its numbers, and ADRs 1 to 4 each name a rejected option (5 and 6 for Senior and above).
One other engineer has scored your checkpoints, or you have posted them and capped your self-score at 2.