Roadmaps / Fundamentals / Who this is for
Read first
Who this is for
Hours by path. A Senior who skims Week 1 and skips Week 0 does about 120 hours. A Staff reader doing Weeks 3, 4 and 9 to 16 needs 10 weeks, 80 hours: 27 weeks at 3 hours a week. The work version is a separate effort of about 30 hours of work time. A Principal does Phase 4 (32 hours) plus the work version, about 62 hours.
| You are | Start at | Skip | Your assignments | Your milestone scope | Aim for |
|---|---|---|---|---|---|
| Fresher (under a year of work; one language, Git, loops) | Week 0, then Week 1 | Nothing. Do all the weeks, and plan 20 | Practice projects 1 and 2 in each phase, and checkpoints 1 to 4 | Core scope: one language, threads or a pool, 1,000 connections | 2 Sound on every dimension |
| Senior (5 to 8 years, ships services) | Week 2 (skim Week 1) | Week 0 | All practice projects, checkpoints 1 to 4 | Adds 10,000 connections, a second language port of one component and ADRs 5 to 7 | 3 Proven on every dimension |
| Staff (10+ years, sets direction) | Weeks 3, 4 and 9 to 16 | Weeks 1, 2 and 5 to 8 | Checkpoints 2, 3 and 4, and the work version (Checkpoint W) | Adds a diagnosis playbook, a concurrency policy and a cost model | 3 on all, 4 on two |
| Principal (15+ years, sets strategy) | The milestone section, Phase 4, then Interview topics | The weekly tables of Phases 1 to 3 | The work version on a real incident or service, plus a checklist others reuse | Adds a decision on a shared diagnosis method for several teams, with a measured outcome | 4 on at least two |
Prerequisites for a fresher. If one is missing, do Week 0 first.
- You can write functions, structs or classes and loops in Java, Go or C++.
- You can use a Linux or macOS terminal and Git.
- You know what a byte, a pointer or reference and a file are.
- You know what an IP address and a port are.
Career change (for example a data scientist moving to backend): start at Week 1. Memory and concurrency are the biggest differences from notebook work.